Downey Engineering

Home
Sunwater1

Downey Engineering assisted Sunwater with the upgrade of their Yarramalong Pump Station PLC from Sy/Max to Schneider Premium PLCs and replacing the old HMI with CitectSCADA HMI using NextG communications from to remote locations.